Follow one stage of getting an experimental aircrafe ready to fly.
August 5 2009
08/05 to 08/09 The bird arrives structural fiberglass repair
| |

08/11 to 08/16 More mechanical & structural repair heavy fairing
|

08/17 to 08/19 Begin serious fairing and primer
| |

08/20 to 08/21 The finish of the preperation & back to the trailer and gone.
|