W.B.W. Home   Encore   Defiance  Gib Sea  Chenoa  Dory  Miranda Leigh  Naughty Lass Centaur
0-lgback2.gif - 15978 Bytes
Encore Home. Core removal Insp... New core. Deck Insp... Gel match & Teak. 40% Teak 07,24 08,09 09,23 Completed


"Encore" Repair October 15, 2005
http://www.cruising.ca/services/docs/SLdone.html
SL-lnch-1tn.gif - 24230 Bytes

Welcome to the final page in my part of the Encore story. Encore has been launched, the re-coring and teak now finished. Depending on the owners wishes replacing the interior of the aft cabin will be another years task and budget.

There is not much to say about the job at this stage. Each of the thumbnails has a 600 pixel wide image attached if you click the thumbnail and shows what I believe to be important finishing details of the work. Please keep in mind the devil is in the detail which is why we will provide close ups. We did not get any Cetol on the stainless, although someone long ago had taken a "mop and bucket" to the teak it is not our way. For before or in progress pictures of the project please use the navigation bar to browse the various enteries during the project.



SLLbow1tn.gif - 25047 Bytes  SLdet-2tn.jpg - 39893 Bytes  SLdet-4tn.jpg - 32160 Bytes 
SLLPHtn.gif - 23206 Bytes  SLdet-1tn.jpg - 31391 Bytes  SLL-aftDKtn.gif - 27403 Bytes 
SLLcfrntN.gif - 24036 Bytes  SLLforhatctn.jpg - 45581 Bytes  SLLswimtn.jpg - 49225 Bytes 

The core material was totally water saturated and had to be cut out wholesale.

sl-PDisAStn.gif - 25174 Bytes 

After cleaning out the area to the skin new exterior fir 1/2" ply is bedded in a mixture of cabosil and resin.

SLlam-1tn.gif - 24621 Bytes 

Finally, and very tricky 3 layers of matt are applied. The job much more difficult as one has to get perfect adhesion on vertical and upside down surfaces.

may18-3tn.jpg - 45340 Bytes 
Encore Home April 9 May 18 June 23 July 9 July 24 August 9 August 20