06cc.gif - 2056 Bytes Thousand Island Cruising guide Lake Ontario Cruising guide Trent Severn Waterwat
eindex.jpg - 3749 Bytes eback.jpg - 3870 Bytes enext.jpg - 3885 Bytes e-email.jpg - 4075 Bytes
DL_08179
Earliest entries posted first. Click on the thumbnail picture for a full screen image
August 17 2009

6:00 AM EDT Monday 17 August 2009

Condition:Fog Temperature:18.9°C Pressure Wind Speed:calm High 30. Risk of a thunderstorm. Low 20.

08169catn.gif - 31908 Bytes 08169cbtn.gif - 35917 Bytes 08169cctn.gif - 37951 Bytes

The bird got extended another day and Chris is getting restless and Debbie twitchy at being away from Durham so long. Chris has roofing and Debbie is in the middle of a job hunt which has to be brutal in the hospitality industry these days.

08169cetn.gif - 30488 Bytes

And so begins another week in the gulag which is not bad as it stays a constant 70f 24/7 and sitting at a desk is far more in keeping with my health than block sanding these days. I see Sweetie eying the screen and know that this is how she escaped the other day so a high priority will be to get some new rubber and get that screen seated so she can have a wide open window.

Tuesday August 18

08199c2tn.gif - 31687 Bytes

Another day off and finally had a meeting with the architect regarding the basement entrance. Good thing as he puts even more emphasis od strength as this is a load bearing wall that carries 2 floors and a roof of weight. It looks like it will mean putting a triple 2x8 lintel above the door after doing extensive shoring before cutting into to wall. The good news is he will only charge $300 for the required drawings for the building permit. So the project stays alive.




08199c1tn.gif - 28322 Bytes

Chris had to take Debbie back to Durham leaving a short day on the bird. However the fill has pretty much run out and there is only enough primer for one more coat so the project is at its final stage for here. Tomorrow Charlie is due to pick it up and take it back to Muskoka for weights andbalancee test then the wings and taxi tests.





6:00 AM EDT Wednesday 19 August 2009

Temperature:19.3°C Wind Speed:NW 9 km/h Sunny. High 25. Risk of a thunderstorm in the afternoon.

Chris worked tirelessly on the bird. At this stage it must be approaching 80 hours since arrival. No different than a boat once you have the rough shape you are not even half way there. In many sections of the fuselage there have been over a dozen fill and fair exercises. Equally, with all grumbling aside this job has turned out very well. The sleek bird that nests in the garage is ready for the next phase. A quick stop for wings at the airport for taxi tests and weights and balances on the runway.

08199cctn.gif - 48343 Bytes 08199c3tn.gif - 35010 Bytes 08199c4tn.gif - 34337 Bytes 08199c5tn.gif - 27305 Bytes
08199c6tn.gif - 29890 Bytes 08199c7tn.gif - 29791 Bytes 08199c8tn.gif - 38049 Bytes
08199c9tn.gif - 39802 Bytes 08199c10tn.gif - 29335 Bytes 08199c11tn.gif - 35312 Bytes
08199c12tn.gif - 35383 Bytes 08199c13tn.gif - 35689 Bytes
08199sd2tn.gif - 43616 Bytes 08199sr1tn.gif - 21846 Bytes
For more information on the KR 2 aircraft please visit the official website.
kr2tn.gif - 30821 Bytes
Fly KR com
06cc.gif - 2056 Bytes Thousand Island Cruising guide Lake Ontario Cruising guide Trent Severn Waterwat
eindex.jpg - 3749 Bytes eback.jpg - 3870 Bytes enext.jpg - 3885 Bytes e-email.jpg - 4075 Bytes
1-wwwcruising.gif - 1189 Bytes

strict © copyright 2009